EPA Reports

Completed assessment reports are listed and summarised below and are available for download. Click the link to view and download archived reports.

To be alerted to new reports, you can follow us on Twitter @EPA_WA or subscribe to RSS feeds from this page by clicking on the RSS icon icon at the top right of this page. Descriptions of how to use Twitter and RSS feeds are in the footer of this website.

Note: Appeals are handled by the Appeals Convenor who is independent of the EPA. Information on preparing and lodging appeals, appeal reports and the Minister's decisions on appeals are available on the Office of the Appeals Convenor's website.


 Search all EPA Reports

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32  ]
No.Report
1387

Oakajee Terrestrial Port Development

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by Oakajee Port and Rail Pty Ltd (OPR) to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton.
Status: Final
Proponent: Oakajee Port and Rail Pty Ltd
Release Date: 14 March 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 2.89 MB)
1386

Solomon Iron Ore Project

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to develop two new mines within the Solomon Project, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway by Fortescue Metals Group Limited (Fortescue).
Status: Final
Proponent: Fortescue Metals Group Limited
Release Date: 14 March 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 3.64 MB)
1384

Shire of Murray Town Planning Scheme No. 4 Amendment 104 (Point Grey) - Review of Ministerial Statement 519

Summary:

This report provides the EPA’s advice to the Minister for the Environment under section 16(e) of the EP Act. The outcome of the EPA’s review of Statement 519 is that the environmental conditions are not required because:

(a) provisions reflecting the requirements of the conditions in Statement 519 are included in Amendment 104 (as modified); and

(b) the extent of the land to be rezoned in Amendment 104 (as modified) has been reduced. Relevant environmental factors such as caves (Ministerial Condition 7) and wetlands (Ministerial Condition 9) are no longer present within the area which is the subject of Amendment 104 (as modified).


Status: Final
Release Date: 16 February 2011
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 5.8 MB)
1385

Busselton Regional Aerodrome

Summary:

Busselton Regional Aerodrome - proposal under s46 of the Environmental Protection Act 1986 to add a condition to Ministerial Statement 399 to allow a Fokker 100 operated by Skywest Airlines to depart from Busselton Regional Aerodrome between 2200 hours on 20 February 2011 and 0100 hours on 21 February 2011.


Status: Final
Proponent: Shire of Busselton
Release Date: 14 February 2011
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 25.47 KB)
1383

Happy Valley Titanium Minerals Project

Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on Bemax Resources Limited’s proposal to develop a mineral sand mining proposal that is located in the Shire of Capel on the Whicher Scarp, 10 km south of the town of Boyanup. The two deposits (northern and southern) contain over 750,000 tonnes of recoverable heavy mineral concentrate and will be mined using open cut, dry mining techniques involving heavy earthmoving equipment and processed through screening and separation plants. This proposal will involve the clearing of 146 ha of native vegetation.
Status: Final
Proponent: BEMAX Resources Limited
Release Date: 14 February 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 2.22 MB)
1382

Central West Coal Project

Summary:

This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Central West Coal Pty Ltd to mine and supply approximately 75 million tonnes of subbituminous grade crushed coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 million tonnes per annum over 30 years.

 Download the summary of submissions (pdf 66kB)

 Download the response to submissions (pdf 1.58 MB)


Status: Final
Proponent: Central West Coal Pty Ltd (a subsidiary of Aviva Corporation Limited)
Release Date: 7 February 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 5.48 MB)
1381

Red Hill Quarry Development

Summary:

This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Hanson Construction Materials Pty Ltd to extend the Red Hill Quarry to the north and west of the current pit, extend the existing stockpile and dispatch area, relocate the primary crusher to the pit and install a quaternary crusher.

Download the response to submissions (pdf 9.52 MB)


Status: Final
Proponent: Hanson Construction Materials Pty Ltd
Release Date: 31 January 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 10.35 MB)
1380

South West Creek Dredging and Reclamation Proposal

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to expand port infrastructure in the Port Hedland Inner Harbour. The development would provide eight new berths in South West Creek, a tributary of the Port Hedland Inner Harbour estuary, and involves dredging with associated onshore and offshore disposal of dredged material.
Status: Final
Proponent: Port Hedland Port Authority
Release Date: 10 January 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 1.75 MB)
1379

Technical Ammonium Nitrate Production Facility, Burrup Peninsula

Summary:

This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Burrup Nitrates Pty Ltd to construct and operate a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate. The proposal is located on the Burrup Peninsula approximately 13 km northwest of Karratha.

 Download the response to submissions (pdf 5.39 Mb)


Status: Final
Proponent: Burrup Nitrates Pty Ltd
Release Date: 10 January 2011
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 1.39 MB)
1378

Development Application – Clearing of native vegetation and planting of 1250 olive trees, Lot 1612 Barrett Street Southern River

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to clear approximately 5 hectares (ha) of native vegetation for an olive grove at Lot 1612 Barrett Street, Southern River by C Campbell.
Status: Final
Proponent: C Campbell
Release Date: 10 December 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 4.1 MB)
1377

Roy Hill 1 Iron Ore Project Port Infrastructure

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to construct and operate port infrastructure located within the Boodarie Multi-user Stockyard Area, adjoining the Port Hedland Inner Harbour. Iron ore would be unloaded at Boodarie and placed via a conveyor into stockpiles before being reclaimed and delivered, via an elevated conveyor, to shipping berths in South West Creek for export.
Status: Final
Proponent: Roy Hill Iron Ore Pty Ltd
Release Date: 10 December 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 4.13 MB)
1375

Gidgegannup Granite Quarry

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by Boral Resources (WA) Ltd to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum.
Download the response to submissions (pdf 1.87 MB)
Status: Final
Proponent: Boral Resources (WA) Ltd
Release Date: 6 December 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 11.23 MB)
1376

Marillana Iron Ore Project

Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to develop and operate the Marillana Iron Ore Project by Brockman Resources Limited.
Download the reponse to submissions (pdf 1.56 MB)  
Download the client supplement to the response on submissions (pdf 2.01 MB)
Status: Final
Proponent: Brockman Resources Limited
Release Date: 6 December 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 4.45 MB)
1374

Hope Downs 4 Iron Ore Mine

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Hamersley HMS Pty Ltd to develop and operate an iron ore mine consisting of open pits and associated infrastructure at the Hope Downs 4 Iron Ore Mine (HD4) within the Shire of East Pilbara.
 Download the Response to submissions (pdf 6.39 MB)
Status: Final
Proponent: Hamersley HMS Pty Ltd
Release Date: 6 December 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 3.98 MB)
1373

PLUTO LIQUEFIED NATURAL GAS DEVELOPMENT (SITE b OPTION) BURRUP PENINSULAR, SHIRE OF ROEBOURNE – PROPOSAL UNDER S46 OF THE EP ACT TO AMEND CONDITIONS 6-12, 6-13 AND 6-14 OF MINISTERIAL STATEMENT 757

Status: Final
Proponent: Woodside Energy Ltd
Release Date: 29 November 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 19.72 KB)
1372

Kwinana Export Facility – Amendment under Section 46 of the EP Act to extend time limit of approval.

Summary: The Minister for Transport has written requesting that the existing environmental conditions be amended to extend the date of substantial commencement of the above proposal for an additional five years.
Status: Final
Release Date: 25 October 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 474.18 KB)
1371

Jimblebar Iron Ore Project

Summary: The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75mtpa.  Open pit mining will occur above and below ground and will involve dewatering.  Excess water will be discharged into the Ophthalmia Dam.
Status: Final
Proponent: BHP Billiton Iron Ore Pty Ltd
Release Date: 18 October 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 2.03 MB)
1370

Roy Hill Infrastructure Railway

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to construct and operate a 300 kilometre (km) railway and associated infrastructure to transport iron ore from the Roy Hill mine to Port Hedland by Roy Hill Infrastructure Pty Ltd (RHI)
Status: Final
Proponent: Roy Hill Infrastructure Pty Ltd
Release Date: 11 October 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 800.06 KB)
1369

Warro Gas Field 3D Onshore Seismic Survey

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Latent Petroleum Pty Ltd (Latent) to conduct an onshore seismic survey for gas 250 Kilometres (km) north-east of Perth
Status: Final
Proponent: Latent Petroleum Pty Ltd
Release Date: 10 October 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 2.56 MB)
1368

Carina Iron Ore Project

Summary:

This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Polaris Metals Pty Ltd to develop the Carina Iron Ore Project on the Yendilberin Hills located approximately 60 km north-east of Koolyanobbing in the Goldfields region.

 Click here to view the proponents's response to submissions (pdf 5.25 Mb)


Status: Final
Proponent: Polaris Metals Pty Ltd
Release Date: 6 October 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 7.81 MB)
1367

Southern Source Integration Assets Pipeline Corridor

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the Southern Source Integration Assets (SSIA) strategic proposal of the Water Corporation. The purpose of the SSIA is to secure corridors necessary for future installation of potable and/or wastewater pipelines and associated infrastructure in the South Metropolitan Area until 2050.
Status: Final
Proponent: Water Corporation
Release Date: 20 September 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 2.12 MB)
1366

Pemberton Sawmill Noise Regulation 17 Variation

Summary: The basis of the application is that, given the fact that the town of Pemberton was originally a timber mill town and therefore has houses in close proximity to the sawmill, the noise emission from the mill has never been able to comply with the prescribed standards of the noise regulations. Though it has been identified that it is practicable to further reduce the noise emissions from several equipment items, and Auswest has committed to implement these controls, Auswest believes that the noise emission from the Pemberton Sawmill operation cannot reasonably or practicably comply with the noise regulations.
Status: Final
Proponent: Auswest Timbers Pty Ltd
Release Date: 20 September 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 187.63 KB)
1362

Forest Management Plan 2004-2013. Mid-term audit of performance report

Summary: This report by the Environmental Protection Authority to the Minister for Environment has been prepared in accordance with Condition 2-3 of Ministerial Statement 641 related to the Forest Management Plan 2004-2013 (FMP).
Status: Final
Proponent: Conservation Commission of Western Australia
Release Date: 13 September 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 7.02 MB)
1365

Wagerup Alumina Refinery Noise Regulation 17 Variation – Supplementary Advice

Summary: In 2002, Alcoa applied to the Minister for the Environment for approval to vary the allowable level of its Wagerup Refinery noise emissions from the prescribed standard. The Environmental Protection Authority provided its advice to the Minister in Bulletin 1215 in January 2006 in conjunction with its advice on the proposed Wagerup 3 expansion.
Following the announcement by Alcoa in late 2008 that Wagerup 3 would be delayed, and after consideration of a Noise Reduction Study, the EPA developed a Proposed Strategy for Assessment of Alcoa's Noise Regulation 17 Application. Essentially the Strategy involves a change of emphasis from engineering noise reduction to noise amelioration through purchase of noise-affected properties and noise insulation of dwellings. The Strategy was put out for stakeholder comment in mid-2009 and was discussed with the Wagerup Tripartite Group. Following this process, the EPA now provides advice supplementary to advice of 2006. The EPA recommends the granting of a noise regulation 17 approval along the lines of the Strategy, that is for a two-year period in which Alcoa must use best endeavours to purchase the remaining noise-affected properties.

Status: Final
Proponent: Alcoa of Australia Ltd
Release Date: 16 August 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 309.32 KB)
1364

Application to Amend Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 – Noise Regulation 17 Report 18

Summary: An application by the Minister for Energy on behalf of Western Power Corporation (WPC) for amendment to the Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 (the Approval) pursuant to regulation 17(9) of the Environmental Protection (Noise) Regulations 1997 (noise regulations). The application is to amend the Approval to extend the duration of the LA10 approved levels in Schedule 1 of the Approval for six months until the end of June 2010.

Status: Final
Proponent: Western Power Corporation
Release Date: 16 August 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 219.18 KB)
1363

Australind Plant Noise Regulation 17 Variation

Summary: Millennium Inorganic Chemicals Ltd (MIC) manufactures titanium dioxide pigments for the coatings and plastics markets. MIC's Australind Plant, located at Lot 4 Old Coast Road, was established in 1963. However, since operations started, residential density has increased with the nearest residents in Laura Avenue only 150 metres from the northern plant boundary. The company considers that the proximity of neighbours made it unlikely that its noise emissions could practicably comply with the prescribed noise limits. This report presents the EPA's formal advice on the application under noise regulation 17(3)(b)(ii).

Status: Final
Proponent: Millennium Inorganic Chemicals Ltd
Release Date: 9 August 2010
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 165.05 KB)
1361

Tropicana Gold Project

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to develop and operate an open-cut gold mine with infrastructure and utilities located approximately 330 kilometres (km) east northeast of Kalgoorlie and 200 km east of Laverton by Tropicana Joint Venture.
Status: Final
Proponent: Tropicana Joint Venture
Release Date: 19 July 2010
Appeals close
Click here for more information
1360

Macedon Gas Development

Summary: This report provides the Environmental Protection Authority's advice and recommendations to the Minister for Environment on the proposal by BHP Billiton Petroleum Pty Ltd to construct a subsea pipeline, onshore gas treatment and compression plant and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas Pipeline.
Status: Final
Proponent: BHP Billiton Petroleum Pty Ltd
Release Date: 5 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.06 MB)
1359

Strategic Environmental Advice on the Dawesville to Binningup Area

Summary: This report provides the Environmental Protection Authority's (EPA) advice to the Minister for Environment under section 16(e) of the Environmental Protection Act 1986 on the significant environmental values of the Dawesville to Binningup area. It applies the state of current knowledge and scientific data about these values to identify areas of conservation significance and areas that may have potential for development and land use compatible with the environmental values of the area.
Status: Final
Release Date: 17 May 2010
No Appeals
Click here for more information
1358

Collie Urea Project, Shotts Industrial Park, Shire of Collie Port of Bunbury

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to establish a urea production plant in the proposed Shotts Industrial Park, 7.5 kilometres (km) east of Collie, by Perdaman Chemicals and Fertilisers Pty Ltd (Perdaman). The plant would process coal mined from the Griffin coal mine north of the Shotts Industrial Park into urea which would be transported by rail to Bunbury Port for export.
Status: Final
Proponent: Perdaman Chemicals and Fertilisers Pty Ltd
Release Date: 10 May 2010
Appeals close
Click here for more information
1357

Cape Lambert Port B

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Pilbara Iron Pty Limited, to construct and operate a second port at Cape Lambert. The port will process and export up to 130 million tonnes of ore per annum (Mtpa).
Status: Final
Proponent: Pilbara Iron Pty Limited
Release Date: 10 May 2010
Appeals close
Click here for more information
1356

Orebody 24/25 Upgrade Project

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by BHP Iron Ore Pty Ltd to develop the Orebody 24 (OB24) deposit to provide crushed ore feed for existing Orebody 25 (OB25) processing facilities.
Status: Final
Release Date: 19 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.3 MB)
1355

Marandoo Mine Phase 2

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to extend mining at the existing Marandoo mine below the water table by Hamersley Iron Pty Ltd, a member of the Rio Tinto group.

Download the response to submissions. (pdf 10.1 Mb)
Status: Final
Proponent: Hamersley Iron Pty Ltd
Release Date: 19 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.88 MB)
1353

Shire of Gingin Town Planning Scheme No. 8 Amendment 93 - Lots 5243, 9504 and 9505 Perth-Lancelin Road, Lancelin

Summary: The Shire of Gingin Town Planning Scheme (TPS) No. 8 Amendment 93 proposes to rezone portions of Lots 5243, 9504 and 9505 Perth-Lancelin Road, Lancelin from 'Rural' to 'Urban Development' zone.
Status: Final
Proponent: Shire of Gingin
Release Date: 12 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.54 MB)
1354

Ord River Irrigation Area Stage 2 M2 Supply Channel - Proposal Under s46 of the EP Act

Summary: That Commitment 55 be amended to require the Environmental Management Entity (EME) to be established prior to 1 January 2012 rather than before ground disturbance activities and Conditions 6, 7, 8, 9, 10 and 12-1 be changed to remove the need for the EPA to approve a number of EMP's and editorial changes to update the Minister's title, the proponent and Departmental names.
Status: Final
Proponent: Minister for State Development
Release Date: 12 April 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 1014.55 KB)
1352

Carnarvon Power Station Noise Regulation 17 Variation

Summary: Horizon Power has already implemented a noise control programme on Carnarvon Power Station at a cost of about $5 million, which has involved extensive plant modifications and noise shielding. As a result, the noise emission levels from this power station have been reduced by between 7.6 and 13.2 dB at the neighbouring residences. However, due to the proximity of residences, the noise emissions from the power station still can not comply with the noise regulations.
Status: Final
Proponent: Horizon Power
Release Date: 15 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 185.42 KB)
1350

Coolimba Power Station Project, Eneabba

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Coolimba Power Pty Ltd to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of:
  • a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and
  • a 330 kV electricity transmission line to connect the power station to the external electricity network at the proposed Eneabba Substation.

Status: Final
Proponent: Coolimba Power Pty Ltd
Release Date: 10 March 2010
Appeals close
Click here for more information
1349

Bluewaters Power Station Expansion - Phase III and Phase IV, Collie

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Griffin Power 3 Pty Ltd to construct and operate Bluewaters Power Station Phases III and IV, an approximately 63 km long wastewater discharge pipeline, and an ocean outfall north of the Leschenault Inlet at Buffalo Road.
Status: Final
Proponent: Griffin Power 3 Pty Ltd
Release Date: 8 March 2010
Appeals close
Click here for more information
1348

Single flight from Busselton Airport between 2200 14/2/10 and 0100 15/2/10

Status: Final
Proponent: Shire of Busselton
Release Date: 8 February 2010
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 170.55 KB)
1347

Koolyanobbing Iron Ore Project - Mt Jackson J1 Deposit

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Cliffs Asia Pacific Iron Or Pty Ltd (Cliffs) to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn.
Status: Final
Proponent: Cliffs Asia Pacific Iron Ore Pty Ltd
Release Date: 8 February 2010
Appeals close
Click here for more information
1346

Albany Port Expansion

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to expand the Port of Albany by the Albany Port Authority.
Status: Final
Proponent: Albany Port Authority
Release Date: 18 January 2010
Appeals close
Click here for more information
1345

Roy Hill 1 Iron Ore Mining Project Stage 2

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO).
Status: Final
Proponent: Roy Hill Iron Ore Pty Ltd
Release Date: 7 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.06 MB)
1344

Shire of Harvey Town Planning Scheme No. 1 Amendment No. 63 - Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup

Summary: The Shire of Harvey proposes to rezone Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup from Residential, Recreation and General Farming to Residential Development and Recreation Zone.
Status: Final
Release Date: 9 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.74 MB)
1343

Iron Ore Mine, Downstream Processing (Direct - Reduced Hot Briquetted Iron) and Port Construction, Cape Preston, Pilbara

Summary: Proposal Under s46 of the EP Act to Amend the Marine Wastewater Outfall Condition
Status: Final
Proponent: Mineralogy Pty Ltd
Release Date: 2 November 2009
Appeals Closed
Click here to view the document (file type: Acrobat PDF file size: 37.96 KB)
1342

Roy Hill 1 Iron Ore Mining Project Stage 1

Summary: This report provides the Environmental Protection Authority's advice and recommendations to the Minister for Environment on the proposal to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure by Roy Hill Iron Ore Pty Ltd.
Status: Final
Proponent: Roy Hill Iron Ore Pty Ltd
Release Date: 2 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.3 MB)
1341

Oakajee Deepwater Port, Oakajee Shire of Chapman Valley Change to Conditions

Summary: Report on the Department of State Development's request for a change to the environmental conditions that apply to the substantial commencement date for works at the Oakajee Deepwater Port, Shire of Chapman Valley.
Status: Final
Proponent: Department of State Development
Release Date: 19 October 2009
No Appeals
Click here to view the document (file type: Acrobat PDF file size: 21.83 KB)
1340

Balmoral South Iron Ore Project, Cape Preston, WA

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd.
Click here to view the response to submissions (PDF 15.2 Mb)
Status: Final
Proponent: Mineralogy Pty Ltd
Release Date: 5 October 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.56 MB)
1339

Port Rockingham Marina

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Rosewood Grove Pty Ltd to construct and operate a new marina located at Rockingham, within Cockburn Sound.
Click here for the proponents's response to submissions.
Status: Final
Proponent: Rosewood Grove Pty Ltd
Release Date: 29 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.59 MB)
1338

Cundaline and Callawa Mining Operations

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal to develop the Cundaline and Callawa deposits using new and existing Goldsworthy infrastructure by BHP Billiton Iron Ore.
Status: Final
Proponent: BHP Billiton Iron Ore
Release Date: 28 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.51 MB)
1337

Nelson Point Dredging, RGP6 Port Development, Port Hedland

Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by BHP Billiton Iron Ore (BHPBIO) to undertake dredging at Nelson Point, Port Hedland.
Status: Final
Proponent: BHP Billiton Iron Ore
Release Date: 7 September 2009
Appeals close