Extension to the Wiluna Uranium Project


Summary: Toro Energy Limited (Toro) proposes to extend its Wiluna Uranium Project, which was assessed by the EPA in May 2012 and approved for implementation subject to conditions. Toro subsequently acquired the neighbouring Millipede and Lake Maitland deposits, located 30 kilometres (km) south and 105 km south-east of Wiluna respectively. It proposes to develop the two deposits and associated infrastructure (Proposed Extension).

This report provides advice and recommendations to the Minister for Environment on the Environmental Protection Authority‚Äôs environmental impact assessment of the proposal by Toro.

Response to Submissions (PDF 7.6 MB)

Revised PER Appendix 10-7 Assessment of Tecticornia Communities Associated Memo Report (PDF 11.2 MB)

Revised PER Appendix 10-49 Flora and Vegetation Consolidation and Conservation Assessment (PDF 6.6 MB)

Revised PER Appendix 10-50 Cumulative Impact Assessment (PDF 11.4 MB)

Response to EPA Submissions Tecticornia Groundwater Dependency (PDF 1.2 MB)

Independent Review Wiluna Extension: Assessment of Potential Impacts on Samphire Vegetation Communities (PDF 4.3 MB)

Vegetation and Flora Management Plan (Revised) (PDF 1 MB)

Wiluna Uranium Extension Project MWH Responses to OEPA PER Comments re SF (PDF 10.4 MB)

MWH Responses to PER Comments Re SF from DPaW DotE and CCWA (PDF 5.7 MB)

Independent Review Subterranean Fauna and Additonal Information (PDF 154 KB)

Revised Subterranean Fauna Management Plan (PDF 3.3 MB)

Revised Terrestrial Fauna Management Plan (PDF 895 KB)

Clarification of Air Quality Modelling (PDF 529 KB)

Environmental Radiation Baseline Review (PDF 974 KB)
 
Review of Occupational Public and Environmental Radiation Impacts (PDF 799 KB)

Response to OEPA request for additional information regarding SF (PDF 10 MB)

Release Date: 6 September 2016
Proponent: Toro Energy Limited
Status: Final
Report Number: 1580
Click here to view the document (file type: Acrobat PDF file size: 3.5 MB)
Appeals Closed